Ray Goerdt Construction

Out to make a living. Not a killing.

Home
About Us
Before and After
Tips
Things We Do
Things We Don't Do
Cob Blast results
Art for your log home
Contact Us
Chain Saw Carving
 
East end of cabin, this was built with fairly short (8'-12') lengths of log flat top and bottom, with a lengthwise spline inserted between courses and at log end seams. This cabin had been pressure washed by the home owner the previous fall.
 
 
a closer look at one side of the east end
 
 
North side of cabin, deck used to come down this side for about 12'.
 
 
closer look at old deck area on north side.
 
 
south side serious decay along deck. also note decay under window on east wall.
 
lots of water comes off the roof!
 
 
Both sides of the door are decayed.
 
 
log ends are almost completely rotted away at the bottom.
 
 
streaking and staining on the inside caused by pressure washing.
 
 
Home owner decided to have the interior cob blasted after initial contract work had been completed
 
 
East wall log replacement and repair completed.
 
 
 
south wall repairs complete.
 
 
North wall repair and cob blasting completed
 
south wall repairs, cob blasting and window/door replacement.
 
 
The exterior is complete.
 
 
streaking and water staining interior walls.
 
 
cob blasting cleaned off almost all of the staining.